Why metrics are-important ?! | Meetup slides

Why metrics are-important ?! | Meetup slides

Table of Contents

A brief of a tech talk about the Backstage project and how it can be used to build an engineering platform.

comments powered by Disqus

Related Posts

Planning a production ready kubernetes with fundamental Controllers & Operators — Part 2 — Secrets

Planning a production ready kubernetes with fundamental Controllers & Operators — Part 2 — Secrets

Originally posted on the Israeli Tech Radar on medium.

This post will continue presenting the idea of “additional controllers which do 80% of the job of making your kubernetes cluster production ready”

Read More
Cloud Native Developer Experience | Reducing the TOIL

Cloud Native Developer Experience | Reducing the TOIL

A presentation about the developer experience and how to reduce the TOIL, given at Tech Radar Conference #3 - 2021.

Read More
From Prompts to Agents — a DevOps Engineer navigating the AI Landscape

From Prompts to Agents — a DevOps Engineer navigating the AI Landscape

TLDR; A.I is no longer a futuristic concept; it’s fundamentally changing how we work today. For those of us specializing in DevOps, SRE, and platform engineering, this shift presents both incredible opportunities and new challenges. We’ve moved quickly from debating if AI will impact our work to figuring out how to effectively integrate it and adapt our skillsets to stay relevant and valuable.

Read More